Circular Cast-In-Place

Experience with CIRCULAR CAST-IN-PLACE PRESTRESSED CONCRETE TANKS

designed in accordance with the AWWA D115-06 Standard or its Predecessors

Designed by: Jorgensen & Close Associates

 

Owner Location Client (If Not Owner)Date Bid (B) Completed (C) or Negotiated (N)Size in MGRemarksCost inDollarsCost ¬ ¢/Gallon
City of Englewood, CO1973 (C)6Horizontal and vertical post-tensioned with tendons; won in alternate bidding competition with strand wrapped and wire wrapped shotcrete with steel diaphragm; part buried, includes excavation and backfill; post-tensioned roof.$536,000 8.9
City of Arvada, CO80th & Simms, Arvada, CO Wright-McLaughlin Engineers1974 (C)10Horizontal and vertical post-tensioned with tendons; was $5,000 higher than strand wrapped alternate, but was selected by contractor and owner due to advantages in wintertime constructability; buried, includes excavation and backfill, post-tensioned roof with tennis courts; includes all landscaping.$860,000 8.6
Ken Caryl Ranch Water DistrictLittleton, CO Wright-McLaughlin Engineers1975 (C)2@2.0Horizontal and vertical post-tensioned with tendons; buried, includes excavation and backfill; post-tensioned roof. Won in alternate bidding competition with wire- and strand-wrapped wall designs. Higher price includes some rock excavation.$283,000&$293,00014.1&14.6
Ken Caryl Ranch Water DistrictLittleton, CO Wright-McLaughlin Engineers1975 (C)5Horizontal and vertical post-tensioned with tendons; buried, includes excavation and backfill; post-tensioned roof. Won in alternate bidding competition with wire- and strand-wrapped wall designs.$580,000 11.6
City of Spokane, WAAtlas Prestressing1976 (C)Design-Build6@2.6Horizontal and vertical post-tensioned with tendons; part buried; open top; secondary clarifiers.See summary belowSee summary below
City of Spokane, WAAtlas Prestressing1976 (C)Design-Build3@2.4Horizontal and vertical post-tensioned with tendons; part buried; dome roof; anaerobic digesters.See summary belowSee summary below
City of Spokane, WAAtlas Prestressing1976 (C)Design-Build3@0.3Horizontal and vertical post-tensioned with tendons; part buried; open top; gravity thickeners.See summary belowSee summary below
Spokane Tank Project SummarySee RemarksThe tendon design for the 12 Spokane tanks noted above, saved $1,800,000 for the owner compared to strand-wrapped alternates designed by others. The solitary $4,000,000 bid received on the strand wrapped tanks had been declared invalid by the EPA (who was partially funding the project) because of lack of fair competition. The contractor then invited nationwide proposals from tank designers and prestressing firms. The tendon tank design by our firm won. (Contact J&CA for a brief article reprinted from Engineering News Record about this savings.)$2,200,000
Total for walls only
9.3 Avg.
City of Carbondale, COWright-McLaughlin EngineersApril1976 (B)2Horizontal and vertical post-tensioned; buried, includes excavation and backfill; post-tensioned roof. Won in alternate bidding competition with wire- and strand-wrapped wall designs.$255,000 12.8
City of Louisville, COLouisville WTP Atlas Prestressing Rocky Mountain Consultants, Inc. Civil EngineersAugust 1976 (B)Design-Build3Horizontal and vertical post-tensioned; with a post-tensioned roof; won in a design / build competition with a steel tank and a reinforced concrete tank with a precast roof. We designed the post-tensioned structural floor as a consultant to Atlas. The pier-supported floor was required due to site conditions. The tank is above ground.$313,000 10.4
Centennial Water DistrictHighlands Ranch, CO Meurer and Associates1976 (C)(Wall Analysis)4Computer structural analysis of the post-tensioned wall for design by others.Not ApplicableNot Applicable
Salt Lake County Water DistrictSalt Lake City, UT Atlas Prestressing1976 (C)Design-Build3Horizontal and vertical post-tensioned; part buried includes excavation and backfill; post-tensioned roof and floor.$345,000 11.5
City of West Jordan, UTAtlas Prestressing1976 (C)Design-Build2Horizontal and vertical post-tensioned; part buried, includes excavation and backfill; post-tensioned roof and floor.$230,000 11.5
Southgate Water DistrictLittleton, CO Meurer and Associates1976 (C)(Wall Analysis)2Computer structural analysis of the post-tensioned wall for design by others.Not ApplicableNot Applicable
City of Loveland, COM&I, Inc. Consulting Engrs1977 (C)(Rehabilitation)3Horizontal post-tensioned tendon repair of a distressed wire-wrapped tank originally designed by others.Not ApplicableNot Applicable
Eastman Kodak CompanyWindsor, COMarch1977 (B)3Horizontal and vertical post-tensioned with tendons; not buried; includes $80,000 architectural precast concrete; post-tensioned roof. Won in alternate bidding competition with wire- and strand-wrapped wall designs.$333,000 11.1
East Larimer Co. Water Dist.Fort Collins, CO M&I, Inc. Consulting EngrsApril1977 (B)2.5Horizontal and vertical post-tensioned with tendons; buried, includes excavation and backfill; post-tensioned roof.Won in alternate bidding competition with wire and strand-wrapped wall designs.$279,000 11.2
East Larimer Co. Water DistrictFort Collins, CO M&I, Inc. Consulting EngineersApril1977 (B)1Horizontal and vertical post-tensioned with tendons; buried, includes excavation and backfill; post-tensioned roof.Won alternate bidding competition with wire- and strand-wrapped wall designs.$146,000 14.6
City of Canon City, COM&I, Inc. Consulting EngrsSeptember1977 (B)4Horizontal and vertical post-tensioned; part buried, includes excavation and backfill; post-tensioned roof.$439,000 11
E. Cherry Cr. Valley Water &San. Dist. Aurora, CO Meurer and Associates1977 (C)(Wall Analysis)1Computer structural analysis of the post-tensioned wall for design by others.Not ApplicableNot Applicable
Denver Water BoardDenver, CO DMJM-Phillips ReisterMarch1978 (B)10Horizontal and vertical post-tensioned; buried, includes excavation and backfill; post-tensioned roof. Owner selected three circular post-tensioned 10 M.G. tanks for this site in lieu of two rectangular conventionally reinforced 15 M.G. tanks proposed by others.$1,225,856 12.3
City of Brigham CityBrigham City, UT VSL Corporation1978 (C)Design-Build5Horizontal and vertical post-tensioned; buried, includes excavation and backfill; post-tensioned roof and floor.Seismic Zone 3.$860,000 17.2
Town of Telluride, COWright-McLaughlin EngineersSeptember1978 (B)0.75Horizontal and vertical post-tensioned; buried, includes excavation and backfill; post-tensioned roof. Won in alternate bidding competition with wire- and strand-wrapped wall designs.$174,000 23.2
Keystone ResortSummit County, CO Meurer and Associates1978 (C)(Wall Analysis)1.5Computer structural analysis of the post-tensioned wall for design by others.Not ApplicableNot Applicable
Mt. Werner Water and San. Dist. Steamboat Springs, CO Wright-McLaughlin EngineersJanuary1979 (B)1Horizontal and vertical post-tensioned; buried, includes excavation and backfill; post-tensioned roof. Won in alternate bidding competition with wire- and strand-wrapped wall designs.$307,000 30.7
Ft. Collins / Loveland,Water DistrictWindsor, CO;Donath Lake Phase IM&I, Inc. Consulting EngineersFebruary1979 (B)2Horizontal and vertical post-tensioned; buried, includes rock excavation and backfill; post-tensioned roof. Won in alternate bidding competition with wire- and strand-wrapped wall designs.$347,000 17.4
National Park ServiceYellowstone National Park, WY Wright-McLaughlin EngineersAugust1979 (B)1Horizontal and vertical post-tensioned; buried, includes excavation and backfill; post-tensioned roof. Won in alternate bidding competition with wire- and strand-wrapped wall designs.$408,524 40.8
Roxborough Water and San.Littleton, COWright-McLaughlin EngineersMarch1980 (B)1Horizontal and vertical post-tensioned; buried, includes rock excavation and backfill; post-tensioned roof.$296,000 29.6
National Park ServiceYellowstone National Park, WY Wright-McLaughlin EngineersMay1980 (B)1.6Horizontal and vertical post-tensioned; buried, includes excavation and backfill; post-tensioned roof.$400,965 25.1
Battlement Mesa Inc.Parachute, CO Wright-McLaughlin EngineersJuly1980 (B)1Horizontal and vertical post-tensioned; buried, includes excavation and backfill; post-tensioned roof.$294,535 29.5
Ft. Collins / Loveland WaterDist. Ft. Collins, CO M&I Inc. Consulting EngineersOctober1980 (B)4Horizontal and vertical post-tensioned; buried, includes excavation and backfill; post-tensioned roof.$640,220 16
Willows Water DistrictEnglewood, CO Meurer and Associates1980 (C)(Wall Analysis)5.25Computer structural analysis of the post-tensioned wall for design by others.Not ApplicableNot Applicable
City of Albuquerque, NMWalker Reservoir Gordon Herkenhoff & AssociatesMarch1981 (B)6.5Horizontal and vertical post-tensioned; buried, includes excavation and backfill; post-tensioned roof and floor. Won in alternate bidding competition with a steel tank.$1,105,000 17
Castle Pines Metropolitan Dist.Castle Rock, CO Taranto, Stanton & TaggeMay1981 (N)(Negotiated)2Horizontal and vertical post-tensioned; buried, includes excavation and backfill; post-tensioned roof and floor.$500,000 25
Battlement Mesa Inc.Parachute, CO Wright-McLaughlin EngineersJuly1981 (B)3Horizontal and vertical post-tensioned; buried, includes excavation and backfill; post-tensioned roof and floor.$623,850 20.8
E. Cherry Cr. Valley Water andSan. Dist. Aurora, CO Meurer and Associates1981 (C)(Wall Analysis)5Computer structural analysis of the post-tensioned wall for design by others.Not AvailableNot Available
City of Fraser, CORocky Mountain EngineersJuly1982 (B)1Horizontal and vertical post-tensioned; buried, includes excavation and backfill; post-tensioned roof.$295,000 29.5
National Park ServiceU.S. Dept. of Interior Yellowstone National Park Wright-McLaughlin EngineersAugust1982 (B)0.75Horizontal and vertical post-tensioned; buried, includes $25,000 worth of rock excavation and backfill; post-tensioned roof.$470,000 62.7
Southgate Water Dist.Littleton, CO Meurer and Associates1982(C)(Wall Analysis)6Computer structural analysis of the post-tensioned wall for design by others.Not AvailableNot Available
Snowmasss Water andSan. Dist.Snowmass at Aspen, COMclaughlin Water Engineers,Ltd.May1983 (B)1Horizontal and vertical post-tensioned; buried with up to 8.5 feet of backfill on post-tensioned tank roof sloped to accommodate the ski run this tank is located in; includes excavation and backfill ($104,000 included for the special sheet pile shoring, dirtwork and under-drain, required due to poor earth-work conditions and site constraints); post-tensioned floor.$430,274 43
Parkville Water DistrictLeadville, CO W.W. Wheeler & AssociatesMay1983 (B)1Horizontal and vertical post-tensioned; buried, includes $33,000 excavation (done in 1982) and backfill; post-tensioned roof.$275,289 27.5
Town of Silverthorne, COMclaughlin Water Engineers, Ltd.May1983 (B)1Horizontal and vertical post-tensioned; buried, includes excavation and backfill; post-tensioned roof and floor.$344,777 34.5
Denver Water BoardLittleton, CO Meheen Engineering Corp.June1983 (B) (Reviewed)10Computer analysis and wall design review and modifications of "V" shaped tendon design by others. Post-tensioned roof and floor. Includes $423,000 excavation and backfill (buried) excludes $359,000 piping, valves and miscellaneous.$1,779,000 17.8
Town of Castle Rock, COCornerstone Builders, Inc.February1984 (B) Design-Build0.5Horizontal and vertical post-tensioned; buried, includes excavation and backfill; post-tensioned roof and floor. The post-tensioned tank was preferred by the owner over a conventionally reinforced tank alternate, which was bid $5,000 less by the same contractor.$183,277 36.7
Stonegate Center MetropolitanDistrictParker, COGreiner EngineeringJuly1984 (B)2.5Horizontal and vertical post-tensioned; buried, includes excavation and backfill; post-tensioned roof and floor.$474,300 19
Castle Pines North MetropolitanDistrictCastle Rock, COTaranto, Stanton and TaggeJuly1984 (N)(Negotiated)2Horizontal and vertical post-tensioned; buried, includes excavation and backfill; post-tensioned roof and floor.$584,000 29.2
Green Mountain Water & SanitationDistrictLakewood, COMcLaughlin Water Engineers, Ltd.February1985 (B)1Horizontal and vertical post-tensioned; buried, includes excavation and backfill; a post-tensioned, drilled pier supported, structural concrete floor was required due to swelling soil conditions at the site; post-tensioned roof.$400,000 40
Town of Castle Rock, COMcLaughlin Water EngineersJune1986 (B)2Horizontal and vertical post-tensioned; buried, includes excavation and backfill; post-tensioned roof and floor.$444,000 22.2
Meadows Metropolitan DistrictNo. 1 Castle Rock, CO Taranto, Stanton and TaggeJuly1986 (B)3Horizontal and vertical post-tensioned; buried, includes excavation and backfill; post-tensioned roof and floor.$509,500 17
City of Golden, CON. Table Mountain, Golden, CO McLaughlin Water EngineersFebruary1987 (B)2Horizontal and vertical post-tensioned; buried, includes excavation and backfill; post-tensioned roof and floor.$376,115 18.8
Consolidated Mutual Water Co.N. Table Mountain, Golden, CO McLaughlin Water EngineersApril1987 (B)2Horizontal and vertical post-tensioned; buried, includes rock excavation and backfill; post-tensioned roof and floor.$387,200 19.4
National Park ServiceGrand Canyon National Park, AZ Mclaughlin Water EngineersAugust1987 (N)(Negotiated)1Horizontal and vertical post-tensioned; partially buried, rock excavation; Chemically treated exterior color to blend in with the scenery.Not AvailableNot Available
Ciba-Geigy Chemical CompanyMcIntosh, AL VSL CorporationMarch1988(Rehabilitation)3.5Investigation and rehabilitation of distressed emergency holding tank for hazardous wastes, designed by others. Horizontal and vertical post-tensioned wall, post-tensioned floor, open top. This tank is fiberglass lined to withstand anything with a pH between 2 & 12. Cost shown is for the post-tensioned concrete floor and wall only.$236,000 6.7
Ciba-Geigy Chemical CompanyMcIntosh, AL VSL CorporationMarch1988(Rehabilitation)2@0.5Investigation and rehabilitation of distressed floors (due to subgrade settlement) of thickener tanks for treatment of hazardous waste, designed by others. Horizontal and vertical post-tensioned wall, conventionally reinforced floor and open top. Cost shown is for post-tensioned concrete floors and walls only.2@$81,00016.2
Ciba-Geigy Chemical CompanyMcIntosh, ALVSL CorporationMarch1988(Rehabilitation)3@0.85Investigation and rehabilitation of distressed floors (due to subgrade settlement) of clarifier tanks for treatment of hazardous wastes, designed by others. Horizontally and vertical post-tensioned wall, conventionally reinforced floor and open top.3@$102,00012
Ciba-Geigy Chemical CompanyMcIntosh, ALVSL CorporationMarch1988(Reviewed)2.5Review and modification to the design of a storm water detention tank, designed by others, prior to construction. Horizontal and vertical post-tensioned wall, post-tensioned floor and open top. Cost shown is for the post-tensioned concrete and floor and wall only.$202,000 8.1
Ciba-Geigy Chemical CompanyMcIntosh, ALVSL CorporationMarch1988(Reviewed)2Review and modification to the design of a storm water detention tank, designed by others, prior to construction. Horizontal and vertical post-tensioned wall, post-tensioned floor and open top. Cost shown is for the post-tensioned concrete and floor and wall only.$146,000 7.3
Hillsdale Powell Utility DistrictKnoxville, TNVSL CorporationApril1988(Reviewed)1.2Review and modification to the design of a clarifier tank, designed by others, prior to construction. Horizontal and vertical post-tensioned wall, post-tensioned floor, open top.$226,000 18.8
Trinity River AuthorityGrand Prairie, TXVSL CorporationApril1988(Reviewed)2@1.4Review and modifications to the design of digester tanks, designed by others, prior to construction. Post-tensioned wall with "V" shaped tendons. Conventionally reinforced floor. These tanks were built inside distressed and abandoned wire-wrapped tanks, using the old walls as exterior forms. Fiberglass dome roof (not included in the cost.)2@$185,00013.2
Triview Metropolitan DistrictMonument, COKKBNA, Inc.April1988(Reviewed)1.5Review and modifications to the design of a water tank, designed by others, prior to construction. Horizontal and vertical post-tensioned wall, post-tensioned floor and roof.Not ApplicableNot Applicable
Snowmass Water and San.DistrictSnowmass at Aspen, COMcLaughlin Water EngineersJuly1988 (B)1Horizontal and vertical post-tensioned; buried, includes excavation and backfill; post-tensioned floor and roof, soil cover varied from 2 ft. to 15 ft. to blend in with the existing topography, requiring steeped footings and roof slabs.$446,752 44.7
Consolidated Mutual Water Co.Green Mountain, Golden, COMcLaughlin Water EngineersAugust1988 (B)0.8Horizontal and vertical post-tensioned; buried; post-tensioned floor and roof slabs.$225,000 28.1
Superior Metropolitan DistrictSuperior, COMcLaughlin Water EngineersOctober1988 (B)1.4Horizontal and vertical post-tensioned; buried, includes excavation and backfill; post-tensioned floor and roof. Floor and roof had additional post-tensioned reinforcement to withstand potential foundation movements.$343,321 24.5
Snowmass Water and San.DistrictRidgerun TankSnowmass at Aspen, COMcLaughlin Water EngineersJune1989 (B)1Horizontal and vertical post-tensioned wall; post-tensioned roof slab; post-tensioned mat foundation as the floor slab; buried with soil cover varying from 4' to 17'-6" to blend in with the existing topography of the site. This required stepped floor and roof slabs, includes excavation and backfill.$645,000 64.5
Lookout Mountain WaterDistrictChief Hosa Storage ReservoirJefferson County, COJuly1989 (B)1Horizontal and vertical post-tensioned wall; post-tensioned floor and roof slabs; buried with no soil cover on the roof slab; price includes rock excavation, backfill and some piping. Owner paid $100,000 additional in first costs for the buried post-tensioned concrete tank in alternate bidding competition with a used steel tank when he considered the present worth of repainting costs, aesthetic value and other advantages of buried concrete reservoir.$347,000 34.7
City of Albuquerque, NMSimms ReservoirBohannan-Huston, Inc.January1990 (B)7Horizontal and vertical and post-tensioned wall; buried; post-tensioned floor and roof. Price includes "normal" excavation and backfill; price does not include about 3.04/gal. worth of rock excavation, over-excavation of collapsible soils and replacement with select backfill below the tank. The owner declined our recommendation for a strand-wrapped wall alternate due to prior poor performance of a strand-wound tank designed by others and good experience with a prior tendon tank we designed. A distressed, above ground, wire-wound tank formerly serving this zone was demolished when this tank was finished.$1,290,000 18.4
City of Salida, COMcLaughlin Water EngineersAugust1990(Rehabilitation)1Horizontal post-tensioned repair of a distressed wire-wrapped tank originally designed by others.Not ApplicableNot Applicable
Perdue Farms, Inc.Accomac, VAVSL CorporationOctober1990(Reviewed)2@4.0Review and modifications to the design of waste sludge tanks designed by others, prior to construction. Horizontal and vertical post-tensioned wall, post-tensioned floor and open top.$400,000 10
Cities of Englewood andLittleton, COBi-City WWTP,Englewood, CODywidag Systems International,USABrown &Caldwell(Civil Engineer)December1990 (B)Design-Build2@2.0Horizontal and vertical post-tensioned walls, above grade with a broken fin exterior architectural finish except for a white finish at external launder and brick veneer at the base of the walls. Conventionally reinforced floor slab and wall footing was designed by others, except for effects of fixed base wall connection. Won in "contractor design" competition with other tendon suppliers and tank designers.NotAvailable(Bid as part of a $25,000,000 WWTP expansion project.)See Fall, 1996 for cost information on identical tanks.Not Applicable
Perdue Farms, Inc.Accomac, VAVSL CorporationDecember1990(Reviewed)2.5Review and modifications to the design of a clarifier tank designed by others, prior to construction. Horizontal and vertical post-tensioned wall, post-tensioned floor, open top.$285,000 11.4
Wampler Longacre PoultryHarrisonburg, VAVSL CorporationFebruary1991(Reviewed)0.7Review and modification to the design of a clarifier tank designed by others, prior to construction. Horizontal and vertical post-tensioned wall, post-tensioned floor and post-tensioned top.$135,000 19.3
West Lynn Creamery DigestersLynn, MAVSL CorporationMay1991(Reviewed)1.8and0.2Review and modifications to the design of an anaerobic digester tank designed by others, prior to construction. Horizontal and vertical post-tensioned walls, post-tensioned floor and open top. A major wire-wound tank builder bid $225,000 higher for the same work.$515,000 28.6
Manenggon Hills Golf ResortGuam, U.S.A.Dames & Moore, Denver, COJune1991 (B)1.5Horizontal and vertical post-tensioned wall; partially buried; conventionally reinforced floor and roof slabs. Contains the days effluent from the wastewater treatment plant for spreading over the golf course at night.Not Available (Bid as part of a $15,000,000 WWTP project)Not Applicable
Manenggon Hills Golf ResortGuam, U.S.A.Dames & Moore, Denver, COPendingneed fortreatmentcapacity0.3Horizontal and vertical post-tensioned wall; buried; conventionally reinforced floor, open top with concrete launder trough; clarifier for WWTP.Not ApplicableNot Applicable
City of Boulder, COand Pine Brook Water DistrictBoulder, COMcLaughlin Water EngineersJuly1991 (B)4.1and0.6Horizontal and vertical post-tensioned walls; buried with backfill sloping up from 2 feet to 10 feet deep over the roof; post-tensioned floor and roof slabs. Price includes excavation and backfill, price does not include $74,460 for over excavation and lime stabilization of up to 25 feet of soft clay under 1/2 of the tank base. The owner elected to build a tank-within-a-tank in order to not commingle water supplies while sharing the same limited site.$974,664for a 4.1 MG Tank$97,042for a 0.6 MG Wall23.8and16.2
Uwchlan Township MunicipalAuthorityExton, PATerre Hill Concrete Products Co.Gannett Fleming, Inc.(Civil Engineer)October1991 (B)Design-Build2Horizontal and vertical precast, post-tensioned walls; buried to within 5 feet of the top of the wall; post-tensioned floor and roof slabs. Price includes structural engineering fee. Price does not include $153,000 (7.7 ¢/gal.) for excavation and backfill.$645,000 32.3
Texas Instruments Corp.McKinney, TXTexas Instruments Corp.VSL Corporation (Engineer)March1992(Rehabilitation)3Investigation and rehabilitation of seepage through the wall of a circular prestressed concrete tank with cast-in-place core wall, originally designed by others.Not ApplicableNot Applicable
Birdsboro BoroughBerks County, PATerre Hill Concrete ProductsKeystone Engineering(Civil Engineer)March1992 (B)Design-Build1.4Horizontal and vertical post-tensioned, precast walls; lowest 3 feet buried; post-tensioned floor and roof slabs. Price includes excavation, backfill and structural engineering fee.$339,600 24.3
City of Albuquerque, NMPonderosa Reservoir #2URS ConsultantsFebruary1993 (B)6Horizontally and vertically post-tensioned walls; buried, with 3 feet of backfill over the post-tensioned two-way flat-plate roof; post-tensioned floor slab. Price includes excavation and backfill, stubbed-out piping and appurtenances.$1,465,900 24.4
Montaire Farms of DelMarVaSelbyville, DelawareApril1993(Investigation)0.5Peer review and modifications to the design of a circular prestressed concrete wastewater treatment tank designed by others prior to construction.Not ApplicableNot Applicable
Town of Silverthorne, COGolden Eagle RoadMcLaughlin Water EngineersJune1995 (B)0.5Horizontally and vertically post-tensioned wall; with 3 feet of backfill over the post-tensioned two-way flat plate roof; post-tensioned floor slab. Price includes excavation and backfill, stubbed out piping and appurtenances.$287,022 57.4
Town of Castle Rock, COGreen Zone II TankMeurer and Assoc., Structural Engr.August1995(Review)2Review and modifications to the design and details of the post-tensioned concrete water tank. Horizontally and vertically post-tensioned wall with post-tensioned floor and two-way flat plate roof.Not ApplicableNot Applicable
Indianapolis Water Co.South Well Field BackwashTankHNTB, Structural Engr.February1996(Review)0.3Review and modifications to the design and details of the circular post-tensioned concrete backwash water tank. Horizontally and vertically post-tensioned floor and two-way flat plate roof.The owner hired us to assist HNTB in copying our typical design developed for circular prestressed concrete water tanks.Not ApplicableNot Applicable
City of Broomfield, COGWRRP WTP, Backwash TankCentric / Jones, ConstructorsFebruary1996(Rehabilitation)1Investigation and rehabilitation of distressed post-tensioned concrete tank originally designed by others. The radially post-tensioned floor slab had failed below the center column during the initial stressing operation.Not ApplicableNot Applicable
City of Westminster, COSemper WTP, ClearwellCentric / Jones, ConstructorsMay1996(Rehabilitation)5Investigation and rehabilitation of distressed and leaking post-tensioned concrete tank originally designed by others. Floor slab had failed around a 5'-0" diameter pipe.Not ApplicableNot Applicable
Cities of Englewood andLittleton, COBi-City WWTP,Englewood, COBrown & CaldwellFall1996 (B)1@2.01@1.5Horizontal and vertical post-tensioned walls, above grade tanks. Price includes broken fin exterior architectural concrete finish, (except white finish at external launder and brick veneer at wall base). Conventionally reinforced floor slab and integral wall footing designed by Brown & Caldwell, except for the effects of the fixed base wall connection. Open top.$561,600$95,600(Exc. & Backfill)$417,628$132,121(Exc. & Backfill)28.14.827.28.8
City of Broomfield, COInterlocken Golf CourseHDR EngineersMarch1997 (B)6Horizontally and vertically post-tensioned wall; buried, with up to 4 feet of backfill over the post-tensioned two-way flay plate roof; post-tensioned floor slab. Price includes excavation and backfill, stubbed-out piping and appurtenances. Price does not include about $90,000 for 10 ft. of lime-treated structural fill below the tank. This tank was designed for H-20 truck loads as it is buried under a public golf course.$1,320,0022
Town of Castle Rock, COPurple Zone TankMcLaughlin Water EngineersJuly1997 (B)1Horizontal and vertical post-tensioned wall; partially buried, includes excavation and backfill; post-tensioned roof and membrane floor.$512,951 51.3
CBP Resources, Inc.Fayetteville, NCD.W. Burt ConcreteConstruction, Inc.September1997 (B)Design-Build2.2Horizontal and vertical post-tensioned wall. Above grade, does not include site preparation. Open top clarifier.$245,000 11.1
CBP Resources, Inc.Fayetteville, NCD.W. Burt ConcreteConstruction, Inc.September1997 (B)Design-Build0.4Horizontal post-tensioned only; conventionally reinforced vertically. Above grade, does not include site preparation. Open top gravity thickener.$108,0027
Grain Processing CorporationWashington, IndianaBowen EngineeringCorporation, G.C.January1998 (B)Design-Build2@1.72@1.01@0.2Value engineering redesign of conventionally reinforced concrete waste treatment tanks originally designed by others. The two 1.0 MG tanks were originally designed to be circular. The others were originally designed as rectangular. All were converted to circular prestressed concrete tanks with horizontally and vertically post-tensioned walls and two-way post-tensioned membrane floors. Price includes walkways on tops of the walls and launders as applicable, and excavation and backfill, but not piping and appurtenances or redesign fees.$1,150,00The owner saved $315,000 as a result of our design.20.9
Corporaci__n Servicos MiradorNorte, S.A.Ciudad Modelo Water TanksSanto Domingo, Dominican RepublicMatsos & Arzeno, S.A.September1998 (B)Design-Build2@2.0Horizontal and vertical post-tensioned cast-in-place wall; not buried; post-tensioned membrane slab floor; post-tensioned two-way flat plate roof. Price includes structural design fee.$459,385each24.3
Superior Metropolitan DistrictNo. 1Superior, COLow Zone Water Storage TankMcLaughlin Water EngineersOctober1998 (B)1.6Horizontal and vertical post-tensioned wall; buried, includes excavation and backfill; post-tensioned floor and roof. Roof designed for allowing water to rise into the cone, 3-feet above the wall joint. Price dose not include $37,500 for 5 ft. of lime-treated structural fill below the tank.$664,475 41.5
Castle Rock DevelopmentCompanyMeadows Yellow Zone Tank 12aCastle Rock, COMeurer & Assoc., (Civil Engineer)January1999 (B)4Horizontal and vertical post-tensioned wall; buried, includes $177,000 for excavation and backfill; post-tensioned floor and roof. Price does not include $62,000 for lime-treated fill below the tank.$980,000 24.5
City of Lafayette, COYellow Zone Water Tank,at the Baseline Road WTPMcLaughlin Water EngineersAugust1999 (B)4Horizontal and vertical post-tensioned wall; buried, includes excavation and backfill; post-tensioned floor and roof. Price includes a premium for an extremely tight site, without room for storage of the excavated materials.$1,400,000 35
Superior Metropolitan DistrictNo. 1Rock Cr. WWTP, Superior, COClarifier Tank and two DigesterTanksMcLaughlin Water EngineersSeptember1999 (B)0.35and2@0.5Horizontal and vertical post-tensioned wall; buried, post-tensioned floor open top.Horizontal and vertical post-tensioned digester walls; buried, with up to three feet of backfill over the post-tensioned two-way flat plate roofs; post-tensioned floor slabs.Unknown, Bid as part of a $1,337,000 add'n to the Water Treatment Plant
Superior Metropolitan DistrictNo. 1Rock Cr. WWTP, Superior, COHigh Zone Water Storage TankMcLaughlin Water EngineersOctober1999 (B)0.5Horizontal and vertical post-tensioned wall; buried, includes excavation and backfill; post-tensioned floor and roof. Roof designed for three feet of backfill plus H-20 trucks on the roof. Price does not include $78,500 for 5 ft. of lime-treated imported structural fill below the tank and exporting excess earth.$457,180 91.4
Superior Metropolitan District No. 1Rock Cr. WWTP, Superior, COMcLaughlin Water EngineersMay2000 (B)0.5Horizontal and vertical post-tensioned wall; buried, includes excavation and backfill; post-tensioned floor, open top.Unknown, bid as part of a $3,600,000 add'n to the Waste Water Treatment Plant
Superior Metropolitan District No. 1Superior, CO, Digester TanksMcLaughlin Water EngineersMay2000 (B)2@0.5Horizontal and vertical post-tensioned wall; buried, includes excavation and backfill; post-tensioned floor and roof. Roof designed for three feet of backfill.Unknown, bid as part of a $3,600,000 add'n to the Waste Water Treatment Plant
Town of FraserMaryvale Subdivision,Grand County, COMcLaughlin Water EngineersJune2001 (B)0.5Horizontal and vertical post-tensioned wall; buried includes excavation and backfill; post-tensioned floor and roof. Roof designed for two feet of backfill and 75 psf snow load.$620,000 1.24
City of Lafayette, COLafayette Wastewater Treatment PlantMcLaughlin Water EngineersOctober2001 (B)0.2,and0.4A circular prestressed concrete primary clarifier, and a prestressed concrete secondary clarifier. Horizontal and vertical post-tensioned walls; buried; post-tensioned floors, open tops.Unknown, bid as part of a $5,000,000 add'n to the Waste Water Treatment Plant
Jiamusi Municipal Auth.City of Jiamusi,People's Republic of ChinaNortheast Public Works Designand Research InstituteJanuary2002 (B)2@3.0Circular prestressed concrete potable water tanks. Horizontally and vertically post-tensioned wall, post-tensioned membrane floor with integral wall and column footings. As with all tanks built in China to date, these have all unbonded tendons, in the floors, walls and roofs. Buried with 2 ft. of backfill on roofs.$481,900 8
Yingkou Waste Disposal Auth.Yingkou WWTP,People's Republic of ChinaNortheast Public Works Designand Research InstituteFebruary2002 (B)1.6,and1.5A circular primary clarifier, a circular secondary clarifier. Horizontally and vertically post-tensioned walls, post-tensioned membrane floors with integral wall footings / foundations.$220,000and$210,00013.8and14.0
Panjin Waste Disposal Auth.Panjin WWTP,People's Republic of ChinaNortheast Public Works Designand Research InstituteMarch2002 (B)1.5A circular prestressed concrete secondary clarifier. Horizontally and vertically post-tensioned walls, post-tensioned structural floors with tension piers and integral wall footings / foundations.$210,000 14
Jinzhou Waste Disposal Auth.Jinzhou WWTP,People's Republic of ChinaNortheast Public Works Designand Research InstituteMarch2002 (B)1.6,and1.5A circular clarifier. A circular secondary clarifier. Horizontally and vertically post-tensioned walls, post-tensioned structural floors with tension piers and integral wall footings / foundations.$170,000and$160,00010.6and10.7
Black Hawk - Central City Sanitation Dist.WW Treatment Fac., Black Hawk, COGreeley and Hansen LLCSpring2003 (B)2@0.25Two circular concrete prestressed concrete secondary clarifiers. Horizontally and vertically post-tensioned walls, post-tensioned floors. Open tops.
San Lorenzo-Cagus Water Supply Auth.San Lorenzo Tank, Puerto RicoGregory L. Morris and Assoc. EngineersSpring20032Horizontal and vertical post-tensioned wall; above ground, includes site preparation on; post-tensioned roof and membrane floor.Unknown at this timeUnknown at this time
San Lorenzo-Cagus Water Supply Auth.San Lorenzo Tank, Puerto RicoGregory L. Morris and Assoc. EngineersSpring20033Horizontal and vertical post-tensioned wall; above ground, includes site preparation on; post-tensioned roof and membrane floor.Unknown at this timeUnknown at this time
Town of Castle RockCastle Oaks Potable Water TankCastle Rock, COHDR Engineers, civil engineerSummer2003 (B)9.8A circular prestressed concrete potable water tank with a horizontally and vertically post-tensioned wall, post-tensioned membrane floor with integral wall and column footings. Above grade.In design stageIn design stage
City of Albuquerque, NMZamora ReservoirAlbuquerque, NMLeedshill-Herkenhoff EngineersUnknownPending Need,Design Completed4Horizontally and vertically post-tensioned wall; buried, with 3 feet of backfill over the two-way flat-plate roof; post-tensioned floor slab. Price includes excavation and backfill, stubbed-out piping and appurtenances.Not yet availableNot yet available