Circular and Rectangular Precast

Experience with PRECAST-PRESTRESSED CIRCULAR AND RECTANGULAR CONCRETE TANKS designed in accordance with the AWWA D115-06 Standard or its Predecessors

Owner
Location
Client (If Not Owner)
Date Bid (B)
Completed (C)
or Negotiated (N)
Size in MGRemarksCost in DollarsCost Cents/Gallon
City of Orting, WA
North End Reservoir
Central Pre-Mix Concrete Company
2010 (B)1.0 MGHorizontal and vertical precast, post-tensioned wall; not buried; post-tensioned membrane slab floor; precast-prestressed concrete roof designed by others. Won in alternate bidding competition with AWWA D110 Types 1 and 3. Price includes structural design fee.$?

$?
for Precast
?

?
for Precast
Frankfort, WV
Frankfort WWTP
Dutchland, Inc.
2010
Design-Build
1.4 MG
for SBR

1.0 MG
for Digestor
Horizontal and vertical precast, post-tensioned walls; not buried; post-tensioned membrane floors and precast post-tensioned walkway supporting the wall tops laterally designed by others. The SBR has a combination of straight and semi-circular walls and baffles. Price includes structural design fee.$1,502,000107
Stafford, VA
Aquia WWTP
Dutchland, Inc.
2009
Design-Build
0.65 MGHorizontal and vertical precast, post-tensioned walls; not buried; conventionally reinforced pile-supported floors and precast post-tensioned walkways supporting the wall tops laterally designed by others. Multi-cell rectangular walls and baffles. Price includes structural design fee.$693,000107
City of Pasadena, WA
Pasadena Reservoir
Central Pre-Mix Concrete Company
2008 (B)1.75 MGHorizontal and vertical precast, post-tensioned wall; not buried; post-tensioned membrane slab floor; precast-prestressed concrete roof designed by others. Won in alternate bidding competition with AWWA D110 Types 1 and 3. Price includes structural design fee. Seismic Zone 3.$1,850,000

$928,032
for Precast only
106

53 for precast only
Thyssenkrup Steel Mills
Mobile, AL
Violia Water
2008
Value Engineered
2 @ 0.3
2 @ 0.2
1 @ 1.5
Originally designed as cast-in-place, these tanks were redesigned in precast-postensioned concrete to save construction cost. the four smaller ones are circular, the larger is multi-cell rectangular. All have prestressed concrete membrane slabs, are above grade and open-topped.
Tulalip Indian Tribe
Marysville, WA
Central Pre-Mix Concrete Company
2007 (B)1.0 MGHorizontal and vertical precast, post-tensioned wall; not buried; post-tensioned membrane slab floor; precast-prestressed concrete roof designed by others. Price includes structural design fee. Seismic Zone 3.$485,21548.5
City of Helena, MT
Missouri River WTP
Clearwell Addition
Central Pre-Mix Concrete Company
2007 (B)1.5 MGHorizontal and vertical precast, post-tensioned wall; not buried; post-tensioned membrane slab floor. Won in alternate bidding competition with AWWA D110 Type 1 ($2.5M), CIP PT ($1.7M), and steel ($1.2M + future maintenence). Price includes structural design fee. Seismic Zone 3.$1,525,000102
Charleston Sanitary Board
Somerset County, Maryland
Dutchland, Inc.
2005 (B)4 @
0.8 MG
Primary Clarifiers with horizontal and vertical precast, post-tensioned wall with launder; not buried; post-tensioned membrane slab floor; open top. Price includes 3-ft freeboard, external walkway and structural design fee.$283,000
each
35.4
City of Crisfield
Somerset County, Maryland
Dutchland, Inc.
2005 (B)2 @
0.2 MG
Horizontal and vertical circular precast, post-tensioned walls; not buried; conventionally reinforced, pile-supported floor; open top clarifiers. Price includes structural design fee.$160,10080.1
Charles County, MD
Swan Point WWTP
Dutchland, Inc.
2005 (B)0.65 MGHorizontal and vertical precast, post-tensioned walls; not buried; conventionally reinforced pile-supported floor; precast-prestressed walkways supporting the wall tops. Price includes structural design fee. This structure is a combination of rectangular and circular walls and baffles to make a Biological Reactor.$693,000107
Charles County, MD
Swan Point WWTP
Dutchland, Inc.
2005 (B)2 @
0.075 MG
Horizontal and vertical circular precast, post-tensioned walls; not buried; conventionally reinforced pile-supported floor. Price includes precast prestressed walls and roof for a pump house between the Clarifiers. Price includes structural design fee. $417,200278
Ross Point Water District
Post Falls, ID
Central Pre-Mix Concrete Company
2002 (B)
Design - Build
1.0 MGHorizontal and vertical precast, post-tensioned wall; not buried; post-tensioned membrane slab floor; precast-prestressed concrete roof designed by others. Price includes structural design fee.$433,008 43.3
Richmond Sanitary District
Richmond, Indiana
HNTB Engineers
2000 (B)2 @ 1.5Horizontal and vertical post-tensioned precast wall panels. Replacement of distressed wire-wound digester tanks originally designed by others and built in 1950. The conventionally reinforced floor was reused, and the floating dome roofs were redesigned by others. Price includes supply and erection of the wall panels and a CIM coating but not the new wall or the new domes.$604,289 20.1
Barbados Water Authority
Cave Hill Tank, Barbados, West Indies
Spancrete Caribbean Ltd.
1998 (B)
Design - Build
3Horizontal and vertical precast, post-tensioned wall; not buried; post-tensioned membrane slab floor; precast-prestressed concrete roof designed by others. Price includes structural design fee and about $80,000 for shipping by barge from Trinidad to Barbados. The Precast-Prestressed concrete tank was preferred by the owner over a steel tank with a fused glass interior, bid at a lower first cost by another contractor.$900,000 30
Barbados Water Authority
Rock Hall Tank, Barbados, West Indies
Spancrete Caribbean Ltd.
1998 (B)
Design - Build
1.2Horizontal and vertical precast, post-tensioned wall; not buried; post-tensioned membrane slab floor; precast-prestressed concrete roof designed by others.Price includes structural design fee and about $45,000 for shipping by barge from Trinidad to Barbados.The Precast-Prestressed concrete tank was selected over steel with fused glass interior, bid at a lower first cost by another contractor.$428,000 35.7
Corporation Servicios Mirador Norte, S.A.
Ciudad Modelo Water Tanks
Santo Domingo, Dominican Republic
Matsos & Arzeno, S.A.
1998 (B)
Design - Build
2 @ 2.0Horizontal and vertical post-tensioned cast-in-place wall; not buried; post-tensioned membrane slab floor; post-tensioned two-way flat plate roof. Price includes structural design fee.$459,385
each
24.3
Superior Metropolitan District No.1
Superior, CO
Low Zone Water Storage Tank
Mclaughlin Water Engineers, Ltd.
1998 (B)1.6Horizontal and vertical post-tensioned wall; buried, includes excavation and backfill; tensioned floor and roof. Roof designed for allowing water to rise into the cone, 3-feet above the wall-roof joint. Price dose not include $37,500 for 5 ft. of lime treated structural fill below the tank.$664,475 41.5
City of Manassas, VA
Manassas WTP Clearwell
Terre Hill Concrete Products Co.
Hayes, Seay, Mattern &Mattern (Civil Engr.)
1996 (B)
Design - Build
1.3Horizontal and vertical precast, post-tensioned wall; part buried; post-tensioned two-way flat plate floor spanning between rock anchors needed for resistance to uplift due to high groundwater; dome roof. Price includes structural engineering fee. Price does not include about $36,000 for the rockanchors.$495,000 38.1
Carbon County, PA
Jim Thorpe Water Filtration Plant
Terre Hill Concrete Products Co.
Cowan Associates, Inc. (Civil Engr.)
1996 (B)
Design - Build
1Horizontal and vertical precast, post-tensioned wall; above grade (wall panels are 48'-5" high), conventionally reinforced two-way flat plate floor and troof slabs. Price includes structural engineering fee.$374,750 37.5
St. Mary's Paper Company
Sault Ste. Marie, Ontario
Pre-Con Company
NLK Consultants, Inc.Civil Engineers
1995 (B)
Design - Build
3.1Horizontally post-tensioned and vertically pre-tensioned, concrete activated sludge tank wall with open top. Tank Contains and treats industrial wastes. Conventionally reinforced floor, designed by others, and cast-in-place "selector tank" not included in price.$500,00
(Wall Only)
Canadian Dollars
16.1
St. Mary's Paper Company
Sault Ste. Marie, Ontario
Pre-Con Company
NLK Consultants, Inc.Civil Engineers
1995 (B)
Design - Build
2.6
Net
3.7
Gross
Horizontally post-tensioned and vertically pre-tensioned, precast concrete clarifier wall with integral launder. The tank contains and treats industrial wastes. Conventionally reinforced floor on 12 ft. of fill within the tank walls (for head), designed by others, not included in price.$600,000
(Walls Only)
Canadian Dollars
16.2
Jefferson Smurfit Corporation
Container Corp. Plant
Jacksonville, FL
Tindall Concrete, Georgia
1993 (N)
Design - Build
1.6Horizontally post-tensioned, precast concrete wall with integral launder. Conventionally reinforced precast concrete effluent box. Tank contains and treats industrial wastes, pile supported floor designed by others not included in price.$220,000
(Walls Only)
13.8
Birdsbro Borough Perks County, PA
Terre Hill Concrete Products
Keystone Engineering (Civil Engr.)
1992 (B)
Design - Build
1.4Horizontal and vertical post-tensioned, precast walls; lowest 3 feet buried; post-tensioned floor and roof slabs. Price includes excavation, backfill and structural engineering fee.$339,600 24.3
Uwchlan Township Municipal Authority
Exton, PA
Tarre Hill Concrete Products Co.
Gannett Fleming, Inc. (Civil Engr.)
1991 (B)
Design - Build
2Horizontal and vertical precast, post-tensioned walls; buried to within 5 feet of the top of the wall; post-tensioned floor and roof slabs. Price includes structural engineering fee. Price does not include 153,000 (7.4/gal.) for excavation and backfill.$645,000 32.3