International Projects

Owner,
Location,
Client,
(If Not Owner)
Year BuiltSize in Million US Gallons
(MG)
and in
Cubic Meters (m3)
Remarks
Shenyang Waste Disposal Auth.,
Shenyang WWTP Addition,
People's Republic of China,
China Northeast Municipal Engineering Design and Research Institute
20102 @ 7.1 MG
2 @ 26,900 m3
A double rectangular prestressed concrete structure with an aeration basin and sequencing batch reactor. Horizontally and vertically post-tensioned walls, post-tensioned membrane floors with integral wall footings/foundations, two-way prestressed concrete roof.
Coca Cola Tank, Trinidad W.I.
Spancast Caribbean Ltd.
20100.5 MG
1,800 m3
Horizontal and vertical precast, post-tensioned wall; not buried;post-tensioned membrane slab floor; precast-prestressed concrete roof designed by others. Price includes structural design fee.
Shenyang Waste Disposal Auth.,
Cass Basin,
People's Republic of China,
China Northeast Municipal Engineering Design and Research Institute
201033.2 MG
125,680 m3
A rectangular prestressed concrete structure with horizontally and vertically post-tensioned walls, post-tensioned membrane floors with integral wall footings/foundations, open top.
Jilin Developing Zone
Jilin Dev. Zone WWTP, Jilin Province,
Peoples Republic of China,
China Northeast Municipal Engineering Design and Research Institute
20092 @ 10.0 MG
2 @ 38100 m3
A rectangular prestressed concrete aeration basin. Horizontally and vertically post-tensioned walls, post-tensioned membrane floors with integral wall footings/foundations. Seismic Zone 3.
Yingkou Water Authority
Yingkou WTP,
Liaoning Province,
People's Republic of China,
China Northeast Municipal Engineering Design and Research Institute
20092 @ 3.5 MG
2 @ 13270 m3
Rectangular prestressed concrete potable water tank with rounded corners. Horizontally and vertically post-tensionedwalls. Post-tensioned membrane floor integral wall footings and foundation. Seismic Zone 3.
Tonghua Waste Disposal Auth.,
Tonghua WWTP,
Jilin Province,
People's Republic of China,
China Northeast Municipal Engineering Design and Research Institute
200915.6 MG
59,100 m3
A rectangular prestressed concrete aeration basin. Horizontally and vertically post-tensioned walls, post-tensioned membrane floors with integral wall footings/foundations. Seismic Zone 3.
Shangzhi Waste Disposal Authority,
Shangzhi WWTP, Heilongjiang Province,
People's Republic of China,
China Northeast Municipal Engineering Design and Research Institute
20099.1 MG
34450 m3
A rectangular prestressed concrete aeration basin. Horizontally and vertically post-tensioned walls, post-tensioned membrane floors with integral wall footings/foundations. Seismic Zone 3.
Kuwait National Petroleum Company (K.S.C.),
Mina Abdulla Refinery (MAB Refinery),
Kuwait,
Paramount Ltd. of India,
Civil Engineer
20092 @ 0.8 MG (3,000 m3)
2 @ 3.0 MG (11,400 m3)
Two circular prestressed concrete secondary clarifiers and two circular "tank-within-a-tank" pre-aeration and aeration basins. All are circumferentially and vertically prestressed based on AWWA D115. The performance specifications allowed for AWWA D110 Type I alternates, which were not competitive. The clarifiers are open topped, and the A-Basins have aluminum dome roofs. The circular tanks have non-prestressed floors designed by others.
Dalian Water Authority,
Liaoning Province,
Dalian Sandaogou WTP,
People's Republic of China,
China Northeast Municipal Engineering Design and Research Institute
20082 @ 5.3 MG
2 @ 20240 m3
Rectangular prestressed concrete potable water tank with rounded corners. Horizontally and vertically post-tensioned walls. Post-tensioned membrane floor integral wall footings and foundation. Seismic Zone 3.
Kuwait National Petroleum Company (K.S.C.),
Mina Al-Ahmadi Refinery (MAA Refinery),
Kuwait,
Paramount Ltd. of India,
Civil Engineer
20082 @ 0.8 MG (3,000 m3)
2 @ 3.0 MG (11,400 m3)
1 @ 0.3 MG (1,100 m3)
Two circular prestressed concrete secondary clarifiers and two circular "tank-within-a-tank" pre-aeration and aeration basins. All are circumferentially and vertically prestressed based on AWWA D115. The performance specifications allowed for AWWA D110 Type I alternates for the circular tanks, which were not competitive. The clarifiers are open topped, and the A-Basins have aluminum dome roofs. There is also a rectangular prestressed concrete sand filter. The circular tanks have non-prestressed floors designed by others. The sand filter has horizontally and vertically post-tensioned walls, a post tensioned elevated floor and open top.
Yingkou Waste Disposal Auth.
Yingkou WWTP Addition,
China Northeast Municipal Engineering Design and Research Institute
2008
8.8 MG
(33,300 m3)
A rectangular prestressed concrete aeration basin. Horizontally and vertically post-tensioned walls, post-tensioned membrane floors with integral wall footings/foundations. Seismic Zone 3.
Hilton Tank,
Trinidad, West Indies,
Spancrete Caribean
20070.3Horizontal and vertical precast, post-tensioned wall; not buried; post-tensioned membrane slab floor; precast-prestressed concrete roof designed by others. Price includes structural design fee.
Shao Xing Municipal Authority,
Shao Xing WWTP, Stage 3,
People's Republic of China
China Northeast Municipal Engineering Design and Research Institute
20064 @ 21.1 MG
4 @ 79,900 m3
Rectangular prestressed concrete Hydrolysis Basins with multiiple semicircular ends. Horizontally and vertically post-tensioned walls, post-tensioned pile-supported structural floor. These structures use unbonded tendons, in the floors and walls. Partially buried. Seismic Zone 3.
Shao Xing Municipal Authority,
Shao Xing WWTP, Stage 3,
People's Republic of China
China Northeast Municipal Engineering Design and Research Institute
20062 @ 19.2 MG
2 @ 72,700 m3
Rectangular prestressed concrete A/O Basins with multiiple semicircular ends. Horizontally and vertically post-tensioned walls, post-tensioned pile-supported structural floor. These structures use unbonded tendons, in the floors and walls. Partially buried. Seismic Zone 3.
US Navy, PACDIV,
Anderson Air Force Base, Guam,
Smithbridge, Guam
20053.4 MG
12,900 m3
Precast-prestressed potable water tank. The wall is post-tensioned circumferentially pretensioned vertically. It has a post-tensioned membrane floor and precast-prestressed concrete roof designed by others. Our design was bid using AWWA D115 at approximately 25% less than a strand-wound (AWWA D110 Type I) alternate proposed by others. Above grade. Price includes structural design fee. Seismic Zone 4.
Harbin Waste Disposal Auth.,
Harbin Taiping WWTP,
People's Republic of China,
China Northeast Municipal Engineering Design and Research Institute
200419.0 MG
71,900 m3
Rectangular prestressed concrete aeration basin with rounded corners. Horizontally and vertically post-tensioned walls. Post-tensioned structural floor with tension piers and integral wall footings/foundation. Seismic Zone 3.
Harbin Waste Disposal Authority,
Harbin Wenchang WWTP,
People's Republic of China,
China Northeast Municipal Engineering Design and Research Institute
200122.5 MG
85,200 m3
Rectangular prestressed concrete aeration basins. Horizontally and vertically post-tensioned walls. Post-tensioned structural floor with tension piers and integral wall footings/foundation. Seismic zone 3.
Changchun Waste Disposal Auth.,
Changchun WWTP,
People's Republic of China,
China Northeast Municipal Engineering Design and Research Institute
200016.0 MG
60,600 m3
Rectangular prestressed concrete aeration basins. Horizontally and vertically post-tensioned walls, post-tensionedmembrane floor and integral wall footings/foundation. The post-tensioned concrete structure is the primary containment for municipal wastes tributary to the plant. Seismic zone 3.